Talk about the installation of integrated sewage treatment equipment
The pipelines of the integrated sewage treatment equipment usePVCpipes or stainless steel pipes, and the connections between the pipes are bonded withPVCadhesive or stainless steel welded. The filler uses suspended biological filler as the biological carrier, which has large biomass, is easy to film, does not form balls, and does not block.
Installation:
1, Foundation: If the equipment is placed above the floor, just prepare a concrete floor with the same appearance as the equipment as the foundation. The foundation pressure needs to be greater than4T/m2, and it also needs to be level and flat. If the equipment is buried below the floor, the foundation elevation needs to be less than or equal to the elevation of the integrated sewage treatment equipment and ensure that water does not accumulate when it rains. The foundation is generally plain concrete (whether it is reinforced or not depends on the local geological conditions).
2、Installation:根据安装图就位,各箱体依次就位,箱体的位置、方向不能放错,互相间距需要准确,并连接好管道。 Inject clean water into the equipment and check whether there are leaks in each pipe. If not, cover the surroundings of the box with soil up to the inspection hole of the integrated sewage treatment equipment, and level the ground. Connect the control line of the electric control box to the water pump, and connect the electric control box to the power supply. When wiring, pay attention to the direction of the fan and motor, which needs to be in the same direction as the fan.
Please indicate the source when reprinting:
www.fuyuanhb.cn