咨询服务电话

NewsFollow us Learn more about water treatment

Precautions for installation of rural integrated sewage treatment equipment

     So, what should you pay attention to when installing this equipment?
       1. Be sure to follow the steps in the installation diagram to ensure that all directions are accurate and the distance meets the requirements.
       2. Measure the water level. If the water level is unbalanced, adjust it in time.
       3. Adjust the test pipe to see if it leaks.
       4. When the rural integrated sewage treatment equipment is powered on, pay attention to the rotation of the blower and fan. Just check whether the direction of rotation is the same as the direction of the indicator light.
       5. After successful installation, connect the electrical equipment where the underground equipment is located and the supporting water pipes and wires of the dosing equipment.
2021/08/03 10:16:21 1263 次