咨询服务电话

NewsFollow us Learn more about water treatment

Learn about the technical performance of integrated sewage equipment

   The equipment can be set up underground, and flowers and plants can be planted on the ground without affecting the surrounding environment.
       The technical performance of integrated sewage equipment is as follows:
       1. The secondary biological contact oxidation treatment process adopts biological contact oxidation, and its treatment effect is better. Moreover, the activated mud has a small volume, strong adaptability to water quality, good impact load resistance, stable effluent water quality, and will not cause sludge expansion. The pool uses elastic three-dimensional fillers with a large specific surface area, making it easy for microorganisms to hang and remove films. Under the same organic matter load conditions, it has a high organic matter removal rate and can increase the solubility of oxygen in the air in water.
       2. The biochemical tank adopts biological contact oxidation method. The volume load of the filler is relatively low. The microorganisms are in the self-oxidation stage and produce less mud. It only takes more than three months (90 days) to discharge mud.
       3. The integrated sewage equipment treatment system is equipped with a fully automatic electrical control system and an equipment failure alarm system. It operates stably and generally does not require dedicated management, as long as the equipment is maintained and maintained in a timely manner.
2022/11/12 11:28:22 1654 次