How to cultivate biofilm in underground integrated sewage equipment
How is biofilm cultivated in underground integrated sewage equipment? Next, let’s give a brief introduction:
1, sewage enters the equipment;
2, start the fan, and the oxygenation amount of the sludge pump and fan is reduced to about half of the normal oxygenation amount;
3. Observe the filling condition in the aerobic tank every day. If there is an orange-yellow or orange-black layer on the filling, Sticky substance, that is, the biofilm has been cultured, and the culture interval is generally10—25day completed;
4, the temperature is generally around Celsius15℃—25℃suitable;
5, If the concentration of raw sewage is too low, cultivate underground
Integrated sewage equipmentThe biofilm takes too long. If necessary, some nutrients should be added, mainly feces or other nutrients;
6,PHThe value needs to be guaranteed at6.5—8.5In between, the raw sewage must be guaranteed to reach a biodegradable state;